<!--
{
  "availability" : [
    "iOS: 14.0.0 -",
    "iPadOS: 14.0.0 -",
    "macCatalyst: 14.0.0 -",
    "macOS: 11.0.0 -",
    "tvOS: 14.0.0 -",
    "visionOS: 1.0.0 -",
    "watchOS: 7.0.0 -"
  ],
  "documentType" : "symbol",
  "framework" : "SwiftUI",
  "identifier" : "/documentation/SwiftUI/ProgressView/init(value:total:)",
  "metadataVersion" : "0.1.0",
  "role" : "Initializer",
  "symbol" : {
    "kind" : "Initializer",
    "modules" : [
      "SwiftUI"
    ],
    "preciseIdentifier" : "s:7SwiftUI12ProgressViewV5value5totalACyAA05EmptyD0VAGGqd__Sg_qd__tcAGRszAGRs_SBRd__lufc"
  },
  "title" : "init(value:total:)"
}
-->

# init(value:total:)

Creates a progress view for showing determinate progress.

```
nonisolated init<V>(value: V?, total: V = 1.0) where Label == EmptyView, CurrentValueLabel == EmptyView, V : BinaryFloatingPoint
```

## Parameters

`value`

The completed amount of the task to this point, in a range
of `0.0` to `total`, or `nil` if the progress is indeterminate.

`total`

The full amount representing the complete scope of the
task, meaning the task is complete if `value` equals `total`. The
default value is `1.0`.

## Discussion

If the value is non-`nil`, but outside the range of `0.0` through
`total`, the progress view pins the value to those limits, rounding to
the nearest possible bound. A value of `nil` represents indeterminate
progress, in which case the progress view ignores `total`.

---

Copyright &copy; 2026 Apple Inc. All rights reserved. | [Terms of Use](https://www.apple.com/legal/internet-services/terms/site.html) | [Privacy Policy](https://www.apple.com/privacy/privacy-policy)